GaussDB High Availability Validation: Failover Times, Failure Scenarios & Backup Impact
This article details GaussDB centralized database high availability testing across a 3AZ deployment, measuring failover times for primary node failures (10-102s), replica failures (read-only 6-150s), backup impact (primary backup reduces TPS 40%), AZ switchover (~9s), and network degradation effects, while noting zombie detection delays and connection handling requirements.